Solutions 4 Energy

S4E_BW_Logo

SMK-Kimpe

SMK-Kimpe

At SMK Mine, the first phase of a 5.17 MWp Solar Power Project has been successfully installed. This phase included land clearing and development, the installation of ground-mounted mounting structures (MMS) for PV modules, inverters, a Battery Energy Storage System (BESS), and related infrastructure. The project also involved connecting the system to the local grid, followed by thorough testing and commissioning. The installed capacity of this phase is 5.17 megawatts peak (MWp) paired with an 18 MWh BESS system, ensuring efficient and reliable energy storage and distribution.